Yingkou Jinhua Machinery Manufacture Co.,Ltd.
Contact: Ms. Lu
Postcode: 115000
Phone: 0417-2611139
Fax: 0417-2639111
Email: ykjinhua@hotmail.com
Sales Hotline: 18841716688
Website: www.jkdmusic.com/en
Address: 114#west,third floor,zhanqian district,yingkou city,liaoning provine
1. The power supply of the tire machine must be in the normal state, and the power supply is in the off position in the non-working state. The air pressure of the internal machine is at the normal pressure, and the air pipe is not connected in the non-working state.
2. Before replacing the tire, check whether the tire frame is deformed, and the air valve is not leaking or cracking.
3. Unscrew the air valve to release the tire air pressure, place the tire in the middle of the compression arm, and operate the compression arm to separate the two sides of the tire from the wheel frame.
4. Operate each switch to remove the anti-tire.
5. When the new tire is installed, the tire Peugeot is up. Operate each switch to install the tire.
6. After assembly, the switches are placed in the off position.